{"id":3538,"date":"2026-06-12T08:37:00","date_gmt":"2026-06-12T05:37:00","guid":{"rendered":"https:\/\/agmp.kz\/june-12-2026-new-coal-fired-power-plants-to-be-built-in-six-cities-in-kazakhstan\/"},"modified":"2026-11-26T16:04:33","modified_gmt":"2026-11-26T13:04:33","slug":"june-12-2026-new-coal-fired-power-plants-to-be-built-in-six-cities-in-kazakhstan","status":"publish","type":"post","link":"https:\/\/agmp.kz\/en\/june-12-2026-new-coal-fired-power-plants-to-be-built-in-six-cities-in-kazakhstan\/","title":{"rendered":"June 12, 2026  New Coal-Fired Power Plants to Be Built in Six Cities in Kazakhstan"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">According to Energy Minister Erlan Akkenzhenov, this will help meet growing demand for electricity and improve the reliability of the Unified Electric Power System, Kazinform reports.<\/p>\n\n<p class=\"wp-block-paragraph\">As the minister noted at the 7th Coal Industry Forum, reliable baseload generation is particularly important amid rising electricity consumption and the growth of industry and the digital economy. In this context, the government has approved the National Project for the Development of Coal-Fired Generation at the direction of the Head of State.<\/p>\n\n<p class=\"wp-block-paragraph\">\u2014<strong> The project covers 2026\u20132030 and provides for the construction of new power facilities and the modernization, expansion, and upgrading of existing ones, Erlan Akkenzhenov noted.<\/strong><\/p>\n\n<p class=\"wp-block-paragraph\"><strong><a href=\"https:\/\/www.inform.kz\/ru\/novie-ugolnie-istochniki-energii-poyavyatsya-vshesti-gorodah-kazahstana-700b28ae\" data-type=\"link\" data-id=\"https:\/\/www.inform.kz\/ru\/novie-ugolnie-istochniki-energii-poyavyatsya-vshesti-gorodah-kazahstana-700b28ae\" target=\"_blank\" rel=\"noreferrer noopener\">Read more<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>According to Energy Minister Erlan Akkenzhenov, this will help meet growing demand for electricity and improve the reliability of the Unified Electric Power System, Kazinform reports. As the minister noted at the 7th Coal Industry Forum, reliable baseload generation is particularly important amid rising electricity consumption and the growth of industry and the digital economy. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":3539,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[34],"tags":[],"class_list":["post-3538","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-in-the-media"],"acf":[],"_links":{"self":[{"href":"https:\/\/agmp.kz\/en\/wp-json\/wp\/v2\/posts\/3538","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/agmp.kz\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/agmp.kz\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/agmp.kz\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/agmp.kz\/en\/wp-json\/wp\/v2\/comments?post=3538"}],"version-history":[{"count":1,"href":"https:\/\/agmp.kz\/en\/wp-json\/wp\/v2\/posts\/3538\/revisions"}],"predecessor-version":[{"id":3540,"href":"https:\/\/agmp.kz\/en\/wp-json\/wp\/v2\/posts\/3538\/revisions\/3540"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/agmp.kz\/en\/wp-json\/wp\/v2\/media\/3539"}],"wp:attachment":[{"href":"https:\/\/agmp.kz\/en\/wp-json\/wp\/v2\/media?parent=3538"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/agmp.kz\/en\/wp-json\/wp\/v2\/categories?post=3538"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/agmp.kz\/en\/wp-json\/wp\/v2\/tags?post=3538"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}